Lesson 13
Zones and department costs
The audit puts a price on the air of the whole plant. The plant manager wants it per department. A zone is a frame around part of the scheme whose label keeps its totals live — demand, pressure, leaks, cost a year — and the report splits the bill between the zones.
-
Go back to the plant as it is
Open
lesson12.gf9and save it aslesson13.gf9. Choose Scenario → As is (baseline): the strip above the sheet reads BASELINE: As is. Press Audit. Zones belong to a scenario, like the elements; this lesson draws them in the baseline first. -
Draw the compressor room
Choose Edit → Add zone and drag a frame around
COMPandFM. A right click, or a click without dragging, cancels. The zone gets a label in its upper-left corner, and the Text tab opens with it:Zone 1 Zone.Q, min Zone.Pmin leaks Zone.Leak, Zone.Cost/yr
Replace
Zone 1withCompressor room. An element belongs to a zone when the centre of its outline lies inside the frame: keep P1 outside. The label can be dragged anywhere inside its frame — on the screenshots the label of the compressor room sits at the bottom, under the compressor; the frame stays where it is.A frame that holds a source is a supply zone. It shows what it delivers, not what it consumes:
Label shows Expected Zone.Q 1960 NL/min Qn of COMP at maximum load Zone.Pmin 6.5 bar Pout of COMP Zone.Leak 0 NL/min no leak drawn inside Zone.Cost 2172 € the full yearly cost of its source The cost is the one the audit settled on in lesson 11: Annual cost calibrated. Without Audit power it would be Cs, the estimate; with an accepted machine, its Annual electricity cost. The label shows about four significant figures — 1960, 6.309, 618.4, 783.9 — and a zone without leaks drawn in it shows 0 NL/min, not a dash.
-
Draw the two lines
Add two more zones, each around a branch and its consumer:
Zone Frame around First line of the label Line 1 P2,B1Line 1Line 2 P3,B2Line 2P1, PG and T1 stay outside every zone — the main belongs to nobody, as on a real plant. Zones should not overlap; if they do, an element counts in the smallest one that covers it.
Label shows Line 1 Line 2 Unit Zone.Q 1095 618.4 NL/min Zone.Pmin 6.309 6.341 bar Zone.Leak 0 0 NL/min Zone.Cost 1388 783.9 € A compressor room and two lines: each label keeps its own totals. Check by hand: how the bill is split
The cost of the plant, 2172 € a year, is split in proportion to the demand at maximum load: Line 1 gets 1095 / (1095 + 618.4) = 63.9 %, that is 1388 €, Line 2 36.1 %, 783.9 €. Two things are not in the split:
- utilization. B1 runs half the time and B2 30 %: by the air they really take on average, 558 against 189 NL/min, Line 1 would pay 75 %. Zones that work different hours are not weighted differently;
- the unidentified leaks. They are spread over the nodes of the network, not drawn as elements, so no zone owns them — and their cost goes to the lines with the rest. Zone.Leak counts only leaks drawn on the sheet: leak orifices and drains.
-
Make a label say more
A zone label is an ordinary text block: everything of lesson 5 works in it, and Zone.Q, Zone.Cost and the others are numbers in formulas. Click the label of Line 1 and type in the Text tab:
Line 1 Zone.Q, min Zone.Pmin {=Zone.Cost / 12} a month, Zone.Share if Zone.Pmin < 6.2 then Pressure low at the lineLine of the label Shows 3 115.6 € a month, 63.9% 4 nothing — B1 gets 6.309 bar Dividing by a plain number keeps the unit, so the cost a month is still in euros. Zone.Share comes with its % sign, written without a space. Zone.Share is the share of the zone in the demand of the whole scheme, Zone.N the number of its consumers, Zone.Pmax the highest pressure inside it.
A zone label with a formula and a condition: the cost a month, and a warning that waits for its moment. -
Give the zones to the plan
Proposed and Leaks repaired have no zones: each scenario has its own. Select the three zone labels (click one, Ctrl+click the others), copy them with Ctrl+C, switch to Scenario → Proposed and paste with Ctrl+V. Ctrl+V puts the copies a little to the right and below the place they came from (20 points), so that a paste is never lost under its original. Move them back as a selection: Ctrl+click the three pasted labels and drag them together — a selection carries the frames with their labels, while a single label dragged on its own only moves inside its frame. Fix a side by dragging if an element ends up on the edge. In Proposed, Line 2 also holds R2. Press Audit.
Label shows Line 1 Line 2 Unit Zone.Q 1050 421.7 NL/min Zone.Pmin 6.009 4.006 bar Zone.Cost 113 a month (1356 a year) 544.6 a year € Line 1 now shows Pressure low at the line: at the lower setting B1 gets 6.009 bar — just above its 6, what the plan wanted, and below the 6.2 you chose as a warning. The compressor room shows 1708 NL/min at 6.17 bar and 1900 € a year.
Line 2 pays 239 € a year less: the regulator cut its air by a third, from 618.4 to 421.7 NL/min. Line 1 takes less air too, 1050 against 1095 NL/min, yet pays only 32 € less (113 € a month is 1356 € a year): its share has grown from 63.9 to 71.34 %. The bill is shared, so a measure on one line moves part of the cost onto the others. Judge a measure by the total of the plant, and read the zones as the split of that total.
The same zones in the plan: the lower setting brings Line 1 down to just above its 6 bar, and the label says so. -
Save it
Save
lesson13.gf9. The PDF report (lesson 16) has a section Compressed air cost by department: the cost of the scheme and where it comes from, a row per zone of consumers — demand, share, cost a year, leaks, lowest pressure — a row Outside the zones and a total; the compressor room follows in a table of its own.
When it does not work
| What you see | Why | What to do |
|---|---|---|
| The label shows – instead of numbers | The scheme is not calculated, or a change cleared the results. | Press Audit. |
| A consumer is counted in the wrong zone | The centre of its outline lies in the other frame, or in none. | Drag a side or a corner of the frame; the label stays inside. |
| Zone.Leak is 0 although the plant leaks | The unidentified leaks of the leak test are not elements. | Draw the leaks you know as leak orifices (Audit leak flow from the survey). |
| The cost does not follow the hours of a department | The split is by demand at maximum load. | Keep it in mind for lines with very different utilization. |
| The zone moves without its elements | Dragging the label moves only the label. | Select the elements and the label together with a selection frame and drag them. |
Try this next
- Put a leak orifice on P3 inside Line 2 with Audit leak flow 50 NL/min and press Audit: Zone.Leak of Line 2 shows it, and Line 2 pays for it.
- Edit → Redraw zone frame with a zone label selected draws a new frame for it.