Lesson 13

Zones and department costs

The audit puts a price on the air of the whole plant. The plant manager wants it per department. A zone is a frame around part of the scheme whose label keeps its totals live — demand, pressure, leaks, cost a year — and the report splits the bill between the zones.

Time about 25 minutes You need lesson12.gf9 — three scenarios of the audited network You finish with lesson13.gf9 — the same, with a compressor room and two lines drawn as zones
  1. Go back to the plant as it is

    Open lesson12.gf9 and save it as lesson13.gf9. Choose Scenario → As is (baseline): the strip above the sheet reads BASELINE: As is. Press Audit. Zones belong to a scenario, like the elements; this lesson draws them in the baseline first.

  2. Draw the compressor room

    Choose Edit → Add zone and drag a frame around COMP and FM. A right click, or a click without dragging, cancels. The zone gets a label in its upper-left corner, and the Text tab opens with it:

    Zone 1
    Zone.Q, min Zone.Pmin
    leaks Zone.Leak, Zone.Cost/yr

    Replace Zone 1 with Compressor room. An element belongs to a zone when the centre of its outline lies inside the frame: keep P1 outside. The label can be dragged anywhere inside its frame — on the screenshots the label of the compressor room sits at the bottom, under the compressor; the frame stays where it is.

    A frame that holds a source is a supply zone. It shows what it delivers, not what it consumes:

    Label showsExpected
    Zone.Q1960 NL/minQn of COMP at maximum load
    Zone.Pmin6.5 barPout of COMP
    Zone.Leak0 NL/minno leak drawn inside
    Zone.Cost2172 €the full yearly cost of its source

    The cost is the one the audit settled on in lesson 11: Annual cost calibrated. Without Audit power it would be Cs, the estimate; with an accepted machine, its Annual electricity cost. The label shows about four significant figures — 1960, 6.309, 618.4, 783.9 — and a zone without leaks drawn in it shows 0 NL/min, not a dash.

  3. Draw the two lines

    Add two more zones, each around a branch and its consumer:

    ZoneFrame aroundFirst line of the label
    Line 1P2, B1Line 1
    Line 2P3, B2Line 2

    P1, PG and T1 stay outside every zone — the main belongs to nobody, as on a real plant. Zones should not overlap; if they do, an element counts in the smallest one that covers it.

    Label showsLine 1Line 2Unit
    Zone.Q1095618.4NL/min
    Zone.Pmin6.3096.341bar
    Zone.Leak00NL/min
    Zone.Cost1388783.9€
    A compressor room and two lines: each label keeps its own totals.

    Check by hand: how the bill is split

    The cost of the plant, 2172 € a year, is split in proportion to the demand at maximum load: Line 1 gets 1095 / (1095 + 618.4) = 63.9 %, that is 1388 €, Line 2 36.1 %, 783.9 €. Two things are not in the split:

    • utilization. B1 runs half the time and B2 30 %: by the air they really take on average, 558 against 189 NL/min, Line 1 would pay 75 %. Zones that work different hours are not weighted differently;
    • the unidentified leaks. They are spread over the nodes of the network, not drawn as elements, so no zone owns them — and their cost goes to the lines with the rest. Zone.Leak counts only leaks drawn on the sheet: leak orifices and drains.
  4. Make a label say more

    A zone label is an ordinary text block: everything of lesson 5 works in it, and Zone.Q, Zone.Cost and the others are numbers in formulas. Click the label of Line 1 and type in the Text tab:

    Line 1
    Zone.Q, min Zone.Pmin
    {=Zone.Cost / 12} a month, Zone.Share
    if Zone.Pmin < 6.2 then Pressure low at the line
    Line of the labelShows
    3115.6 € a month, 63.9%
    4nothing — B1 gets 6.309 bar

    Dividing by a plain number keeps the unit, so the cost a month is still in euros. Zone.Share comes with its % sign, written without a space. Zone.Share is the share of the zone in the demand of the whole scheme, Zone.N the number of its consumers, Zone.Pmax the highest pressure inside it.

    A zone label with a formula and a condition: the cost a month, and a warning that waits for its moment.
  5. Give the zones to the plan

    Proposed and Leaks repaired have no zones: each scenario has its own. Select the three zone labels (click one, Ctrl+click the others), copy them with Ctrl+C, switch to Scenario → Proposed and paste with Ctrl+V. Ctrl+V puts the copies a little to the right and below the place they came from (20 points), so that a paste is never lost under its original. Move them back as a selection: Ctrl+click the three pasted labels and drag them together — a selection carries the frames with their labels, while a single label dragged on its own only moves inside its frame. Fix a side by dragging if an element ends up on the edge. In Proposed, Line 2 also holds R2. Press Audit.

    Label showsLine 1Line 2Unit
    Zone.Q1050421.7NL/min
    Zone.Pmin6.0094.006bar
    Zone.Cost113 a month (1356 a year)544.6 a year€

    Line 1 now shows Pressure low at the line: at the lower setting B1 gets 6.009 bar — just above its 6, what the plan wanted, and below the 6.2 you chose as a warning. The compressor room shows 1708 NL/min at 6.17 bar and 1900 € a year.

    Line 2 pays 239 € a year less: the regulator cut its air by a third, from 618.4 to 421.7 NL/min. Line 1 takes less air too, 1050 against 1095 NL/min, yet pays only 32 € less (113 € a month is 1356 € a year): its share has grown from 63.9 to 71.34 %. The bill is shared, so a measure on one line moves part of the cost onto the others. Judge a measure by the total of the plant, and read the zones as the split of that total.

    The same zones in the plan: the lower setting brings Line 1 down to just above its 6 bar, and the label says so.
  6. Save it

    Save lesson13.gf9. The PDF report (lesson 16) has a section Compressed air cost by department: the cost of the scheme and where it comes from, a row per zone of consumers — demand, share, cost a year, leaks, lowest pressure — a row Outside the zones and a total; the compressor room follows in a table of its own.

When it does not work

What you seeWhyWhat to do
The label shows – instead of numbersThe scheme is not calculated, or a change cleared the results.Press Audit.
A consumer is counted in the wrong zoneThe centre of its outline lies in the other frame, or in none.Drag a side or a corner of the frame; the label stays inside.
Zone.Leak is 0 although the plant leaksThe unidentified leaks of the leak test are not elements.Draw the leaks you know as leak orifices (Audit leak flow from the survey).
The cost does not follow the hours of a departmentThe split is by demand at maximum load.Keep it in mind for lines with very different utilization.
The zone moves without its elementsDragging the label moves only the label.Select the elements and the label together with a selection frame and drag them.

Try this next

Related help topics: